Assessment Year | 1996 |
---|---|
Principal Product | Auto Ignition Wire |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
150,000
ft2
|
Annual Production | 7,280,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $303,409 | 5,703,986 |
kWh
|
$0.053 |
Electricity Demand | $101,522 | 14,670 |
kW-mo/yr
|
$6.92 |
Electricity Fees | $277 | - |
|
- |
Natural Gas | $109,085 | 25,573 |
MMBtu
|
$4.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,993 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $9,377 | $17,535 |
$4,692
88,218
kWh
|
$4,685
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,996 | $330 |
$1,000
18,757
kWh
|
$996
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.6218: Turn off equipment when not in use | $1,849 | $200 |
$1,849
34,584
kWh
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48 | $140 |
$24
586
kWh
|
$24
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $723 | $900 | - | - |
$723
-
MMBtu
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $334 | $1,000 | - | - |
$334
-
MMBtu
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,104 | $450 |
$47
879
kWh
|
$79
-
kW-mo/yr
|
$978
-
MMBtu
|
- | - | - | |
08 | 2.2136: Install / repair insulation on steam lines | $1,438 | $2,795 | - | - |
$1,438
-
MMBtu
|
- | - | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $2,624 | $60,000 | - | - | - |
$2,624
-
Tgal
|
- | - | |
10 | 3.4115: Recover and reuse cooling water | $9,500 | $40,000 | - | - | - | - |
$8,000
-
gal
|
$1,500
-
Tgal
|
|
TOTAL RECOMMENDED | $28,993 | $123,350 |
$7,612
143,024
kWh
|
$5,784
-
kW-mo/yr
|
$3,473
-
MMBtu
|
$2,624
-
Tgal
|
$8,000
-
gal
|
$1,500
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,180 | $79,065 |
$7,541
141,559
kWh
|
$5,681
-
kW-mo/yr
|
$334
-
MMBtu
|
$2,624
-