Assessment Year | 1996 |
---|---|
Principal Product | Coil Springs |
NAICS |
n/a
|
SIC | 3490: |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
84,000
ft2
|
Annual Production | 37,302,194
pieces
|
Production Hrs. Annual | 2,423
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,203 | 1,751,465 |
kWh
|
$0.057 |
Electricity Demand | $58,656 | 6,410 |
kW-mo/yr
|
$9.15 |
Electricity Fees | $(-18,747.0) | - |
|
- |
Natural Gas | $40,217 | 9,693 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,350 | $480 |
$3,350
58,030
kWh
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $9,194 | $14,890 |
$5,472
93,787
kWh
|
$3,722
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $779 | $1,000 | - | - | - |
$779
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,675 | $807 |
$1,091
19,343
kWh
|
$584
-
kW-mo/yr
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $934 | $1,914 | - | - | $934 | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $561 | $300 |
$561
9,086
kWh
|
- | - | - | - | |
07 | 2.7135: Install occupancy sensors | $705 | $400 |
$447
7,913
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $866 | $20 |
$466
7,620
kWh
|
$400
-
kW-mo/yr
|
- | - | - | |
09 | 2.8123: Pay utility bills on time | $464 | - | - | - | $464 | - | - | |
10 | 3.1175: Use a different or recycled raw material | $1,198 | $1,080 | - | - | - | - |
$1,198
-
lb
|
|
TOTAL RECOMMENDED | $19,726 | $20,891 |
$11,387
195,779
kWh
|
$4,964
-
kW-mo/yr
|
$1,398 |
$779
-
MMBtu
|
$1,198
-
lb
|
||
TOTAL IMPLEMENTED | $12,628 | $17,077 |
$7,124
122,216
kWh
|
$4,306
-
kW-mo/yr
|
- | - |
$1,198
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs