ITAC Assessment: ND0230
ITAC logo
ITAC Assessment: ND0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fuel senders, Fuel rails
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 373
Plant Area 95,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,434 7,385,111
kWh
Natural Gas $47,136 15,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,172 $792 $3,172
69,168
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $2,518 $500 $2,518
55,100
kWh
-
03 2.4133: Use most efficient type of electric motors $1,549 $5,320 $1,549
33,705
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,125 $1,088 $1,125
24,619
kWh
-
05 2.7444: Close holes and openings in building such as broken windows $564 $650 - $564
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $57 $450 $57
1,172
kWh
-
TOTAL RECOMMENDED $8,985 $8,800 $8,421
183,764
kWh
$564
-
MMBtu
TOTAL IMPLEMENTED $5,285 $6,762 $4,721
102,873
kWh
$564
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs