ITAC Assessment: ND0219
ITAC logo
ITAC Assessment: ND0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Industrial Coatings
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area 40,000
ft2
Annual Production 700
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,857 2,348,769
kWh
Natural Gas $93,190 20,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,069 $600 $8,069
155,627
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $3,373 $200 $3,373
65,064
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,443 $2,720 $2,443
47,186
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,277 $1,180 $2,277
43,962
kWh
- -
05 3.5311: Recover and reuse waste material $42,622 $50,000 $1,250
24,033
kWh
$41,372
-
Tgal
-
06 3.2121: Convert to electrostatic powder coating $17,600 $24,500 - - $17,600
-
gal
TOTAL RECOMMENDED $76,384 $79,200 $17,412
335,872
kWh
$41,372
-
Tgal
$17,600
-
gal
TOTAL IMPLEMENTED $76,384 $79,200 $17,412
335,872
kWh
$41,372
-
Tgal
$17,600
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs