| Assessment Year | 1995 |
|---|---|
| Principal Product | Industrial Coatings |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 115 |
| Plant Area |
40,000
ft2
|
| Annual Production | 700
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,857 | 2,348,769 |
kWh
|
$0.052 |
| Natural Gas | $93,190 | 20,107 |
MMBtu
|
$4.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $76,384 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,069 | $600 |
$8,069
155,627
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $3,373 | $200 |
$3,373
65,064
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $2,443 | $2,720 |
$2,443
47,186
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,277 | $1,180 |
$2,277
43,962
kWh
|
- | - | |
| 05 | 3.5311: Recover and reuse waste material | $42,622 | $50,000 |
$1,250
24,033
kWh
|
$41,372
-
Tgal
|
- | |
| 06 | 3.2121: Convert to electrostatic powder coating | $17,600 | $24,500 | - | - |
$17,600
-
gal
|
|
| TOTAL RECOMMENDED | $76,384 | $79,200 |
$17,412
335,872
kWh
|
$41,372
-
Tgal
|
$17,600
-
gal
|
||
| TOTAL IMPLEMENTED | $76,384 | $79,200 |
$17,412
335,872
kWh
|
$41,372
-
Tgal
|
$17,600
-
gal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs