ITAC Assessment: ND0214
ITAC logo
ITAC Assessment: ND0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automotive Stampings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,900
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,735 3,890,973
kWh
Natural Gas $31,963 6,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,832 $311 $26,832
433,763
kWh
-
02 2.4133: Use most efficient type of electric motors $12,665 $3,510 $12,665
204,865
kWh
-
03 2.3212: Optimize plant power factor $5,927 $8,281 $5,927
-
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,886 $830 $5,886
159,730
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $3,807 $500 $3,807
61,547
kWh
-
06 3.5111: Filter and reuse hydraulic oil $4,752 $3,500 - $4,752
-
gal
TOTAL RECOMMENDED $59,869 $16,932 $55,117
859,905
kWh
$4,752
-
gal
TOTAL IMPLEMENTED $49,190 $5,151 $49,190
859,905
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs