*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Miniature Precision Zinc and Plastic Parts
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 24,000
ft2
Annual Production 390,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,153 773,760
kWh
Electricity Demand $8,504 2,542
kW-mo/yr
Electricity Fees $9,741 -
Natural Gas $6,004 476
MMBtu
LPG $3,679 108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,242 $53,572 $20,246
223,222
kWh
$1,045
-
kW-mo/yr
$(-8,049.0)
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,069 $15,975 $5,069
55,889
kWh
- - -
03 2.1331: Burn a less expensive grade of fuel $2,667 $2,565 - - $(-1,012.0)
-
MMBtu
$3,679
-
MMBtu
04 2.2511: Insulate bare equipment $2,594 $2,614 $2,594
28,596
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $753 $2,210 $753
8,310
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $338 $300 $338
3,722
kWh
- - -
TOTAL RECOMMENDED $24,663 $77,236 $29,000
319,739
kWh
$1,045
-
kW-mo/yr
$(-9,061.0)
-
MMBtu
$3,679
-
MMBtu
TOTAL IMPLEMENTED $338 $300 $338
3,722
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings