ITAC Assessment: ND0212
ITAC logo
ITAC Assessment: ND0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Brass and Aluminum Castings
NAICS
n/a
SIC 3362:
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 46,000
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 4,212
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,029 2,187,573
kWh
Natural Gas $88,777 19,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $855 $80 $855
13,482
kWh
02 2.3212: Optimize plant power factor $4,281 $550 $4,281
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,408 $647 $2,408
38,101
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,569 $750 $1,569
24,619
kWh
05 2.7111: Reduce illumination to minimum necessary levels $463 $300 $463
7,327
kWh
06 2.4133: Use most efficient type of electric motors $5,638 $5,480 $5,638
88,804
kWh
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $559 $2,200 $559
12,309
kWh
TOTAL RECOMMENDED $15,773 $10,007 $15,773
184,642
kWh
TOTAL IMPLEMENTED $9,113 $2,027 $9,113
76,202
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings