Assessment Year | 1995 |
---|---|
Principal Product | Brass and Aluminum Castings |
NAICS |
n/a
|
SIC | 3362: |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
46,000
ft2
|
Annual Production | 2,400,000
lb
|
Production Hrs. Annual | 4,212
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,029 | 2,187,573 |
kWh
|
$0.034 |
Natural Gas | $88,777 | 19,692 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,773 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,113 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $855 | $80 |
$855
13,482
kWh
|
|
02 | 2.3212: Optimize plant power factor | $4,281 | $550 |
$4,281
-
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,408 | $647 |
$2,408
38,101
kWh
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,569 | $750 |
$1,569
24,619
kWh
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $463 | $300 |
$463
7,327
kWh
|
|
06 | 2.4133: Use most efficient type of electric motors | $5,638 | $5,480 |
$5,638
88,804
kWh
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $559 | $2,200 |
$559
12,309
kWh
|
|
TOTAL RECOMMENDED | $15,773 | $10,007 |
$15,773
184,642
kWh
|
||
TOTAL IMPLEMENTED | $9,113 | $2,027 |
$9,113
76,202
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs