ITAC Assessment: ND0209
ITAC logo
ITAC Assessment: ND0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product semi trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 75,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 6,032
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,168 2,855,217
kWh
Natural Gas $38,482 8,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,987 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $484 - - $484
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,079 $1,200 $5,079
92,907
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,016 $490 - $1,016
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $926 $547 $926
16,999
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $900 $938 $900
6,448
kWh
-
06 2.4133: Use most efficient type of electric motors $4,749 $7,975 $4,749
86,753
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,157 $3,720 - $2,157
-
MMBtu
08 2.6212: Turn off equipment during breaks, reduce operating time $525 $1,400 $525
9,672
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $151 $520 $151
2,638
kWh
-
TOTAL RECOMMENDED $15,987 $16,790 $12,330
215,417
kWh
$3,657
-
MMBtu
TOTAL IMPLEMENTED $10,844 $9,665 $9,828
179,660
kWh
$1,016
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs