Assessment Year | 1995 |
---|---|
Principal Product | semi trailers |
NAICS |
n/a
|
SIC | 3715: Truck Trailers |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
75,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 6,032
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,168 | 2,855,217 |
kWh
|
$0.055 |
Natural Gas | $38,482 | 8,180 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,987 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,844 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $484 | - | - |
$484
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,079 | $1,200 |
$5,079
92,907
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,016 | $490 | - |
$1,016
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $926 | $547 |
$926
16,999
kWh
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $900 | $938 |
$900
6,448
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $4,749 | $7,975 |
$4,749
86,753
kWh
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,157 | $3,720 | - |
$2,157
-
MMBtu
|
|
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $525 | $1,400 |
$525
9,672
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $151 | $520 |
$151
2,638
kWh
|
- | |
TOTAL RECOMMENDED | $15,987 | $16,790 |
$12,330
215,417
kWh
|
$3,657
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,844 | $9,665 |
$9,828
179,660
kWh
|
$1,016
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs