ITAC Assessment: ND0207
ITAC logo
ITAC Assessment: ND0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 179,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,802 1,820,633
kWh
Natural Gas $81,276 14,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,073 $2,208 $6,073
111,958
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $561 $2,015 $561
10,258
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $20,500 $19,000 - $20,500
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $74 $275 $74
2,345
kWh
-
TOTAL RECOMMENDED $27,208 $23,498 $6,708
124,561
kWh
$20,500
-
MMBtu
TOTAL IMPLEMENTED $26,647 $21,483 $6,147
114,303
kWh
$20,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs