ITAC Assessment: ND0197
ITAC logo
ITAC Assessment: ND0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product metal dies
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $50
M
to 100
M
# of Employees 640
Plant Area 430,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $993,990 18,250,000
kWh
Natural Gas $38,222 8,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,167

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39,102 $3,900 $39,102
681,419
kWh
02 2.4133: Use most efficient type of electric motors $14,959 $25,920 $14,959
274,619
kWh
03 2.7135: Install occupancy sensors $3,537 $800 $3,537
65,064
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,719 $2,179 $1,719
31,653
kWh
05 2.4221: Install compressor air intakes in coolest locations $1,387 $1,850 $1,387
25,498
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $455 $1,330 $455
8,499
kWh
TOTAL RECOMMENDED $61,159 $35,979 $61,159
1,086,752
kWh
TOTAL IMPLEMENTED $57,167 $33,849 $57,167
1,013,189
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs