Assessment Year | 1998 |
---|---|
Principal Product | Concrete Products |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 68 |
Plant Area |
107,267
ft2
|
Annual Production | 709
thousand feet
|
Production Hrs. Annual | 2,300
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $23,036 | 541,325 |
kWh
|
$0.043 |
Electricity Demand | $21,944 | 4,462 |
kW-mo/yr
|
$4.92 |
Electricity Fees | $4,572 | - |
|
- |
Natural Gas | $34,037 | 6,568 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,857 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $867 | $2,852 |
$585
13,775
kWh
|
$264
-
kW-mo/yr
|
$18 | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,970 | $9,180 |
$1,205
28,429
kWh
|
$726
-
kW-mo/yr
|
$39 | - | - | - | |
03 | 2.1224: Replace boiler | $12,990 | $48,188 | - | - | - |
$12,990
-
MMBtu
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $746 | $257 | - | - | - |
$746
-
MMBtu
|
- | - | |
05 | 4.821: Pay bills on time to avoid late fees | $3,385 | $750 | - | - | - | - | - | $3,385 | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $60,255 | $34,840 | - | - | - | - | $60,255 | - | |
07 | 4.211: Consider use / purchase of bulk materials where possible | $6,567 | $1,500 | - | - | - | - | - | $6,567 | |
TOTAL RECOMMENDED | $86,780 | $97,567 |
$1,790
42,204
kWh
|
$990
-
kW-mo/yr
|
$57 |
$13,736
-
MMBtu
|
$60,255 | $9,952 | ||
TOTAL IMPLEMENTED | $13,857 | $51,040 |
$585
13,775
kWh
|
$264
-
kW-mo/yr
|
$18 |
$12,990
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs