ITAC Assessment: NV0104
ITAC logo
ITAC Assessment: NV0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Concrete Products
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 107,267
ft2
Annual Production 709
thousand feet
Production Hrs. Annual 2,300
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,036 541,325
kWh
Electricity Demand $21,944 4,462
kW-mo/yr
Electricity Fees $4,572 -
Natural Gas $34,037 6,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $867 $2,852 $585
13,775
kWh
$264
-
kW-mo/yr
$18 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,970 $9,180 $1,205
28,429
kWh
$726
-
kW-mo/yr
$39 - - -
03 2.1224: Replace boiler $12,990 $48,188 - - - $12,990
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $746 $257 - - - $746
-
MMBtu
- -
05 4.821: Pay bills on time to avoid late fees $3,385 $750 - - - - - $3,385
06 4.652: Replace existing equipment with more suitable substitutes $60,255 $34,840 - - - - $60,255 -
07 4.211: Consider use / purchase of bulk materials where possible $6,567 $1,500 - - - - - $6,567
TOTAL RECOMMENDED $86,780 $97,567 $1,790
42,204
kWh
$990
-
kW-mo/yr
$57 $13,736
-
MMBtu
$60,255 $9,952
TOTAL IMPLEMENTED $13,857 $51,040 $585
13,775
kWh
$264
-
kW-mo/yr
$18 $12,990
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs