ITAC Assessment: UD0423
ITAC logo
ITAC Assessment: UD0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product folding cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 220,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 6,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,638 8,396,835
kWh
Natural Gas $58,983 12,881
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $18,774 $50,000 - - $18,774
02 2.8114: Change rate schedules or other changes in utility service $62,721 $150,000 - - $62,721
03 2.3191: Use demand controller or load shedder $16,236 $30,000 $16,236
-
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,024 $400 $1,024
22,860
kWh
- -
05 2.2437: Recover waste heat from equipment $17,559 $10,000 $(-1,619.0)
(-74,150)
kWh
$19,178
-
MMBtu
-
06 2.6218: Turn off equipment when not in use $920 - $502
23,154
kWh
$418
-
MMBtu
-
TOTAL RECOMMENDED $117,234 $240,400 $16,143
(-28,136)
kWh
$19,596
-
MMBtu
$81,495
TOTAL IMPLEMENTED $36,954 $80,400 $17,762
46,014
kWh
$418
-
MMBtu
$18,774
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs