| Assessment Year | 1994 |
|---|---|
| Principal Product | steel processing |
| NAICS |
n/a
|
| SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
200,000
ft2
|
| Annual Production | 576,000
ton
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $431,680 | 8,320,047 |
kWh
|
$0.052 |
| Natural Gas | $87,850 | 23,092 |
MMBtu
|
$3.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $23,569 | $40,205 | - |
$23,569
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,930 | $2,250 |
$17,930
345,545
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $12,144 | $30,800 |
$12,144
467,761
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $7,111 | $300 |
$7,111
137,163
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $3,616 | $5,000 |
$3,616
80,305
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,413 | $1,464 |
$2,413
46,893
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $313 | $760 |
$313
6,155
kWh
|
- | |
| 08 | 2.7444: Close holes and openings in building such as broken windows | $56 | $60 | - |
$56
-
MMBtu
|
|
| TOTAL RECOMMENDED | $67,152 | $80,839 |
$43,527
1,083,822
kWh
|
$23,625
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs