Assessment Year | 1994 |
---|---|
Principal Product | steel processing |
NAICS |
n/a
|
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
200,000
ft2
|
Annual Production | 576,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $431,680 | 8,320,047 |
kWh
|
$0.052 |
Natural Gas | $87,850 | 23,092 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $23,569 | $40,205 | - |
$23,569
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,930 | $2,250 |
$17,930
345,545
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $12,144 | $30,800 |
$12,144
467,761
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $7,111 | $300 |
$7,111
137,163
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $3,616 | $5,000 |
$3,616
80,305
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,413 | $1,464 |
$2,413
46,893
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $313 | $760 |
$313
6,155
kWh
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $56 | $60 | - |
$56
-
MMBtu
|
|
TOTAL RECOMMENDED | $67,152 | $80,839 |
$43,527
1,083,822
kWh
|
$23,625
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs