ITAC Assessment: OK0926
ITAC logo
ITAC Assessment: OK0926
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Sweet potato products
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,588
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $566,262 7,526,800
kWh
Electricity Demand $104,626 29,856
kW-mo/yr
Natural Gas $181,317 26,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $8,746 $28,000 - - - $8,746
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,480 $22,750 $9,296
120,258
kWh
$184
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $11,134 - - - $11,134 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,061 $100,000 $34,591
447,497
kWh
$2,470
-
kW-mo/yr
- -
TOTAL RECOMMENDED $66,421 $150,750 $43,887
567,755
kWh
$2,654
-
kW-mo/yr
$11,134 $8,746
-
MMBtu
TOTAL IMPLEMENTED $9,480 $22,750 $9,296
120,258
kWh
$184
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs