Assessment Year | 1994 |
---|---|
Principal Product | Rubber |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
100,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $783,084 | 11,479,484 |
kWh
|
$0.068 |
Natural Gas | $137,853 | 39,859 |
MMBtu
|
$3.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $115,109 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,945 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $32,960 | $32,960 |
$400
5,862
kWh
|
- |
$32,560
-
Tgal
|
|
02 | 2.4133: Use most efficient type of electric motors | $23,523 | $21,380 |
$23,523
344,959
kWh
|
- | - | |
03 | 2.3212: Optimize plant power factor | $21,631 | $30,688 |
$21,631
-
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,480 | $900 |
$18,480
271,102
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $5,525 | $1,050 |
$5,525
810,375
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,162 | $7,693 |
$4,162
611,079
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $3,796 | $400 |
$3,796
55,686
kWh
|
- | - | |
08 | 2.2113: Repair or replace steam traps | $2,707 | $2,500 | - |
$2,707
-
MMBtu
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,576 | $200 | - |
$1,576
-
MMBtu
|
- | |
10 | 2.1213: Direct warmest air to combustion intake | $403 | $500 | - |
$403
-
MMBtu
|
- | |
11 | 2.2531: Re-size charging openings or add movable cover or door | $346 | $150 | - |
$346
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $115,109 | $98,421 |
$77,517
2,099,063
kWh
|
$5,032
-
MMBtu
|
$32,560
-
Tgal
|
||
TOTAL IMPLEMENTED | $53,945 | $62,611 |
$49,316
956,038
kWh
|
$4,629
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs