ITAC Assessment: ND0190
ITAC logo
ITAC Assessment: ND0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Processed steel
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 146,634
ft2
Annual Production 384,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,665 9,833,236
kWh
Natural Gas $225,421 51,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $21,765 $33,110 $21,765
415,885
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,032 $1,000 $6,032
115,182
kWh
-
03 2.8121: Apply for tax-free status for energy purchases $5,000 $250 - $5,000
04 2.4221: Install compressor air intakes in coolest locations $2,114 $300 $2,114
40,445
kWh
-
05 2.7135: Install occupancy sensors $1,185 $2,400 $1,185
22,567
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $368 $815 $368
7,034
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $326 $170 $326
6,155
kWh
-
TOTAL RECOMMENDED $36,790 $38,045 $31,790
607,268
kWh
$5,000
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs