ITAC Assessment: ND0187
ITAC logo
ITAC Assessment: ND0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product automotive aluminum wheels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 213
Plant Area 158,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $822,880 17,287,222
kWh
Natural Gas $521,587 151,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $15,561 $3,270 $15,561
327,081
kWh
02 2.4133: Use most efficient type of electric motors $12,387 $15,255 $12,387
257,620
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,902 $1,412 $1,902
39,859
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $984 - $984
20,516
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $159 $420 $159
3,224
kWh
TOTAL RECOMMENDED $30,993 $20,357 $30,993
648,300
kWh
TOTAL IMPLEMENTED $28,932 $18,525 $28,932
605,217
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs