ITAC Assessment: ND0178
ITAC logo
ITAC Assessment: ND0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Switches and Gauges
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 30,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,676 376,319
kWh
Natural Gas $5,696 1,212
MMBtu
Other Energy $2,989 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $2,812 $4,000 $(-177.0)
(-1,758)
kWh
$2,989
02 2.7142: Utilize higher efficiency lamps and/or ballasts $849 $50 $849
9,086
kWh
-
03 2.4133: Use most efficient type of electric motors $235 $432 $235
2,638
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $681 $575 $681
7,327
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $247 $200 $247
2,638
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $206 $160 $206
2,052
kWh
-
TOTAL RECOMMENDED $5,030 $5,417 $2,041
21,983
kWh
$2,989
TOTAL IMPLEMENTED $1,765 $1,057 $1,765
19,051
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs