ITAC Assessment: ND0177
ITAC logo
ITAC Assessment: ND0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product machined parts
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area 101,000
ft2
Annual Production 7,320,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,504 1,896,835
kWh
Natural Gas $10,268 1,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $3,500 $2,710 $3,500
43,083
kWh
02 2.4133: Use most efficient type of electric motors $2,532 $2,941 $2,532
31,067
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,994 - $1,994
24,619
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $370 $270
4,396
kWh
05 2.4221: Install compressor air intakes in coolest locations $48 $200 $48
586
kWh
TOTAL RECOMMENDED $8,344 $6,221 $8,344
103,751
kWh
TOTAL IMPLEMENTED $48 $200 $48
586
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs