ITAC Assessment: ND0172
ITAC logo
ITAC Assessment: ND0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Water pump and transmission bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 195,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $795,555 19,839,391
kWh
Natural Gas $107,400 19,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $10,840 $9,278 $10,840
154,748
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,700 $1,850 $10,700
152,696
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,480 $1,446 $3,480
49,824
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,160 $1,160 - $2,160
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $842 $580 $842
12,016
kWh
- -
06 2.8123: Pay utility bills on time $298 - - - $298
TOTAL RECOMMENDED $28,320 $14,314 $25,862
369,284
kWh
$2,160
-
MMBtu
$298
TOTAL IMPLEMENTED $21,838 $11,128 $21,540
307,444
kWh
- $298
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs