Assessment Year | 1993 |
---|---|
Principal Product | Water pump and transmission bearings |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
195,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $795,555 | 19,839,391 |
kWh
|
$0.040 |
Natural Gas | $107,400 | 19,507 |
MMBtu
|
$5.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,838 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $10,840 | $9,278 |
$10,840
154,748
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,700 | $1,850 |
$10,700
152,696
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,480 | $1,446 |
$3,480
49,824
kWh
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,160 | $1,160 | - |
$2,160
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $842 | $580 |
$842
12,016
kWh
|
- | - | |
06 | 2.8123: Pay utility bills on time | $298 | - | - | - | $298 | |
TOTAL RECOMMENDED | $28,320 | $14,314 |
$25,862
369,284
kWh
|
$2,160
-
MMBtu
|
$298 | ||
TOTAL IMPLEMENTED | $21,838 | $11,128 |
$21,540
307,444
kWh
|
- | $298 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs