ITAC Assessment: DS0169
ITAC logo
ITAC Assessment: DS0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Hydraulic Iron Workers and Circular Cold Saws
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 108,500
ft2
Annual Production 1,740
pieces
Production Hrs. Annual 3,380
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,701 1,937,280
kWh
Electricity Demand $340 48
kW-mo/yr
Electricity Fees $7,129 -
LPG $19,967 2,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,062 $246 $1,062
18,464
kWh
- - - - - -
02 2.2515: Use optimum thickness insulation $496 $316 $496
8,499
kWh
- - - - - -
03 2.7135: Install occupancy sensors $850 $1,512 $850
14,654
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $2,943 $1,000
17,292
kWh
- - - - - -
05 3.6124: Burn waste oil for heat $5,018 $1,695 - $1,085
-
MMBtu
$3,933
-
gal
- - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,398 $4,230 - - - $1,398
-
lb
- - -
07 3.8142: Distill contaminated solvents for reuse $3,694 $4,083 $(-47.0)
(-879)
kWh
- $2,131
-
gal
- $(-2,860.0) - $4,470
08 4.211: Consider use / purchase of bulk materials where possible $5,929 $12,962 - - - - - - $5,929
09 4.515: Install shelves / racks to utilize unused space $600 $1,288 - - - - - $600 -
TOTAL RECOMMENDED $20,047 $29,275 $3,361
58,030
kWh
$1,085
-
MMBtu
$6,064
-
gal
$1,398
-
lb
$(-2,860.0) $600 $10,399
TOTAL IMPLEMENTED $17,303 $23,217 $2,015
34,877
kWh
$1,085
-
MMBtu
$6,064
-
gal
- $(-2,860.0) $600 $10,399
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs