ITAC Assessment: ND0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product steel automotive parts
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 1,700,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $942,561 19,917,351
kWh
Natural Gas $213,584 76,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $5,964 $4,533 $5,964
126,026
kWh
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $17,072 $60,040 - $17,072
-
MMBtu
03 2.3212: Optimize plant power factor $12,500 $22,673 $12,500
-
kWh
-
04 2.2311: Heat treat parts only to required specifications or standards $7,558 $8,500 - $7,558
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,000 $1,000 $6,000
126,612
kWh
-
06 2.2437: Recover waste heat from equipment $3,240 $3,890 $3,240
68,581
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,880 $1,290 - $1,880
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,330 $3,655 - $1,330
-
MMBtu
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,056 $430 - $1,056
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $918 $772 $918
19,343
kWh
-
11 2.2514: Cover open tanks $869 $1,002 - $869
-
MMBtu
12 2.7447: Install vinyl strip / high speed / air curtain doors $421 $2,020 - $421
-
MMBtu
13 2.6218: Turn off equipment when not in use $124 - $124
2,638
kWh
-
TOTAL RECOMMENDED $58,932 $109,805 $28,746
343,200
kWh
$30,186
-
MMBtu
TOTAL IMPLEMENTED $6,124 $1,000 $6,124
129,250
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs