Assessment Year | 1993 |
---|---|
Principal Product | paper |
NAICS |
n/a
|
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
195,000
ft2
|
Annual Production | 68,000
ton
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,156 | 3,504,103 |
kWh
|
$0.069 |
Natural Gas | $17,273 | 4,212 |
MMBtu
|
$4.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,688 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,787 | $3,235 |
$2,787
40,152
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,595 | $868 |
$3,595
46,893
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,045 | $160 |
$4,045
58,324
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $254 | $780 |
$254
1,758
kWh
|
- | |
05 | 2.2522: Isolate hot or cold equipment | $1,367 | $2,541 |
$618
8,792
kWh
|
$749
-
MMBtu
|
|
06 | 2.5194: Redesign process | $261 | $80 |
$118
1,758
kWh
|
$143
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $657 | $1,700 | - |
$657
-
MMBtu
|
|
08 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $307 | $4,550 | - |
$307
-
MMBtu
|
|
09 | 2.4221: Install compressor air intakes in coolest locations | $1,133 | $400 |
$1,133
16,413
kWh
|
- | |
10 | 2.2437: Recover waste heat from equipment | $844 | $1,200 | - |
$844
-
MMBtu
|
|
TOTAL RECOMMENDED | $15,250 | $15,514 |
$12,550
174,090
kWh
|
$2,700
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,688 | $4,343 |
$10,545
147,127
kWh
|
$143
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs