ITAC Assessment: ND0168
ITAC logo
ITAC Assessment: ND0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Steel Forgings and Stampings
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 20,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,772 333,529
kWh
Natural Gas $4,584 811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,540 $2,800 n/a - $1,540
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,188 $200 n/a $1,188
12,016
kWh
-
03 2.4133: Use most efficient type of electric motors $261 $283 n/a $261
2,638
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $354 $450 n/a $354
3,517
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $172 $46 n/a $172
1,758
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $197 $350 n/a $197
2,052
kWh
-
TOTAL RECOMMENDED $3,712 $4,129 $2,172
21,981
kWh
$1,540
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs