ITAC Assessment: ND0165
ITAC logo
ITAC Assessment: ND0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Personalized Paper Products
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 105,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,706 843,200
kWh
Natural Gas $38,212 6,634
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $100 - $100
2,052
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $1,650 $160 $1,650
35,756
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,121 $7,820 $3,121
67,409
kWh
-
04 2.1224: Replace boiler $4,125 $7,740 - $4,125
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $102 $320 - $102
-
MMBtu
06 2.4133: Use most efficient type of electric motors $276 $6,620 $276
6,155
kWh
-
TOTAL RECOMMENDED $9,374 $22,660 $5,147
111,372
kWh
$4,227
-
MMBtu
TOTAL IMPLEMENTED $2,026 $6,780 $2,026
43,963
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs