ITAC Assessment: ND0163
ITAC logo
ITAC Assessment: ND0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Automated Transport equipment
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,566 1,217,761
kWh
Natural Gas $13,300 3,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,887 $2,004 n/a $7,887
155,920
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $372 $324 n/a - $372
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $314 $300 n/a $314
6,155
kWh
-
04 2.4133: Use most efficient type of electric motors $671 $3,880 n/a $671
13,189
kWh
-
TOTAL RECOMMENDED $9,244 $6,508 $8,872
175,264
kWh
$372
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs