ITAC Assessment: ND0160
ITAC logo
ITAC Assessment: ND0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Outdoor furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,594 1,701,348
kWh
Natural Gas $63,081 14,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 3.4115: Recover and reuse cooling water $7,900 $18,500 - - $7,900
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,871 $330 $1,871
39,859
kWh
- -
03 2.4133: Use most efficient type of electric motors $488 $1,250 $488
9,672
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,610 $1,350 - $1,610
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $830 $250 $830
16,413
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $70 $100 $70
1,465
kWh
- -
TOTAL RECOMMENDED $12,769 $21,780 $3,259
67,409
kWh
$1,610
-
MMBtu
$7,900
-
Tgal
TOTAL IMPLEMENTED $3,259 $1,930 $3,259
67,409
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs