ITAC Assessment: ND0151
ITAC logo
ITAC Assessment: ND0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product cable & conduit assemblies
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,943 2,004,103
kWh
Natural Gas $41,703 9,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,186

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,186 $433 $2,186
32,825
kWh
02 2.4133: Use most efficient type of electric motors $4,399 $737 $4,399
65,944
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $344 $570 $344
5,275
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $252 $200 $252
3,810
kWh
05 2.4221: Install compressor air intakes in coolest locations $32 $300 $32
586
kWh
06 2.7122: Disconnect ballasts $43 $160 $43
586
kWh
TOTAL RECOMMENDED $7,256 $2,400 $7,256
109,026
kWh
TOTAL IMPLEMENTED $2,186 $433 $2,186
32,825
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs