| Assessment Year | 1993 |
|---|---|
| Principal Product | cable & conduit assemblies |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
150,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,943 | 2,004,103 |
kWh
|
$0.066 |
| Natural Gas | $41,703 | 9,870 |
MMBtu
|
$4.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,186 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,186 | $433 |
$2,186
32,825
kWh
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $4,399 | $737 |
$4,399
65,944
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $344 | $570 |
$344
5,275
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $252 | $200 |
$252
3,810
kWh
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $32 | $300 |
$32
586
kWh
|
|
| 06 | 2.7122: Disconnect ballasts | $43 | $160 |
$43
586
kWh
|
|
| TOTAL RECOMMENDED | $7,256 | $2,400 |
$7,256
109,026
kWh
|
||
| TOTAL IMPLEMENTED | $2,186 | $433 |
$2,186
32,825
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs