ITAC Assessment: CO0390
ITAC logo
ITAC Assessment: CO0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product commercial printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 80,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,111 1,428,488
kWh
Electricity Demand $63,384 4,752
kW-mo/yr
Electricity Fees $153 -
Natural Gas $5,858 1,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,031

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,461 $782 $434
24,326
kWh
$1,027
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $140 $202 $43
2,345
kWh
$97
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $370 $700 $130
7,327
kWh
$240
-
kW-mo/yr
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $310 $730 $90
5,275
kWh
$220
-
kW-mo/yr
- - - - -
05 3.8142: Distill contaminated solvents for reuse $3,220 $3,600 $(-10.0)
(-586)
kWh
- - $570
-
gal
$(-440.0) $3,100 -
06 3.5121: Recycle waste ink and cleanup solvent $1,640 $1,640 - - $(-4,800.0)
-
gal
- - $6,440 -
07 4.653: Maintain/enlarge a stock of spare parts $7,110 $340 - - - - - - $7,110
TOTAL RECOMMENDED $14,251 $7,994 $687
38,687
kWh
$1,584
-
kW-mo/yr
$(-4,800.0)
-
gal
$570
-
gal
$(-440.0) $9,540 $7,110
TOTAL IMPLEMENTED $11,031 $4,394 $697
39,273
kWh
$1,584
-
kW-mo/yr
$(-4,800.0)
-
gal
- - $6,440 $7,110
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs