Assessment Year | 1992 |
---|---|
Principal Product | BOTTOM UNLOADERS |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 159
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $17,253 | 242,966 |
kWh
|
$0.071 |
Natural Gas | $7,617 | 1,535 |
MMBtu
|
$4.96 |
Other Energy | $1,633 | 18 |
MMBtu
|
$90.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,306 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $3,760 | $14,000 | - |
$3,760
-
MMBtu
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $582 | $4,765 |
$582
8,206
kWh
|
- | - | - | |
03 | 2.1332: Convert combustion equipment to burn natural gas | $1,535 | $1,200 | - |
$(-98.0)
-
MMBtu
|
$1,633
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $582 | $300 |
$582
8,206
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38 | $500 |
$125
1,758
kWh
|
- | - | $(-87.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $104 | $269 |
$104
1,465
kWh
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $62 | $200 |
$62
879
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $6,663 | $21,234 |
$1,455
20,514
kWh
|
$3,662
-
MMBtu
|
$1,633
-
MMBtu
|
$(-87.0) | ||
TOTAL IMPLEMENTED | $1,306 | $5,834 |
$1,393
19,635
kWh
|
- | - | $(-87.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs