ITAC Assessment: ND0046
ITAC logo
ITAC Assessment: ND0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BOTTOM UNLOADERS
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area
n/a
Annual Production 159
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,253 242,966
kWh
Natural Gas $7,617 1,535
MMBtu
Other Energy $1,633 18
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $3,760 $14,000 - $3,760
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $582 $4,765 $582
8,206
kWh
- - -
03 2.1332: Convert combustion equipment to burn natural gas $1,535 $1,200 - $(-98.0)
-
MMBtu
$1,633
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $582 $300 $582
8,206
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $38 $500 $125
1,758
kWh
- - $(-87.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $269 $104
1,465
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $62 $200 $62
879
kWh
- - -
TOTAL RECOMMENDED $6,663 $21,234 $1,455
20,514
kWh
$3,662
-
MMBtu
$1,633
-
MMBtu
$(-87.0)
TOTAL IMPLEMENTED $1,306 $5,834 $1,393
19,635
kWh
- - $(-87.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs