ITAC Assessment: ND0045
ITAC logo
ITAC Assessment: ND0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALUMINUM DIE CASTINGS
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 15,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,630 7,838,511
kWh
Natural Gas $310,623 228,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,000 $25,240 $6,000
111,372
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,840 $579 $3,087
57,444
kWh
$(-247.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,324 $1,000 $3,324
60,082
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,874 $1,000 $1,874
34,877
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $44 $29
586
kWh
-
TOTAL RECOMMENDED $14,067 $27,863 $14,314
264,361
kWh
$(-247.0)
TOTAL IMPLEMENTED $12,193 $26,863 $12,440
229,484
kWh
$(-247.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs