Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 2,080,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,615 8,170,868
kWh
Natural Gas $84,356 21,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,927 $4,000 $14,927
239,449
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $960 $1,500 - $960
-
MMBtu
03 2.4133: Use most efficient type of electric motors $512 $214 $512
8,206
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,778 $9,550 $6,778
108,734
kWh
-
05 2.2437: Recover waste heat from equipment $1,983 $500 - $1,983
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,023 $200 $1,023
16,413
kWh
-
07 2.6121: Reduce hot water temperature to the minimum required $993 - $950
15,240
kWh
$43
-
MMBtu
TOTAL RECOMMENDED $27,176 $15,964 $24,190
388,042
kWh
$2,986
-
MMBtu
TOTAL IMPLEMENTED $26,153 $15,764 $23,167
371,629
kWh
$2,986
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs