ITAC Assessment: ND0034
ITAC logo
ITAC Assessment: ND0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DAIRY,BUTTER
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area
n/a
Annual Production 6,150,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,126 2,435,815
kWh
Natural Gas $250,865 107,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,322 $11,510 $3,322
49,531
kWh
- -
02 2.2511: Insulate bare equipment $2,439 $2,439 - $2,439
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,724 $680 $2,034
30,481
kWh
- $(-310.0)
04 2.2113: Repair or replace steam traps $812 $650 - $812
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $689 $250 $689
10,258
kWh
- -
06 2.2511: Insulate bare equipment $667 $324 $667
9,965
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $58 $231 - $58
-
MMBtu
-
TOTAL RECOMMENDED $9,711 $16,084 $6,712
100,235
kWh
$3,309
-
MMBtu
$(-310.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs