ITAC Assessment: ND0033
ITAC logo
ITAC Assessment: ND0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AIRCRAFT SHAFTS
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,880 2,065,651
kWh
Natural Gas $12,803 2,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,764 $7,603 $1,764
34,584
kWh
- -
02 2.3212: Optimize plant power factor $10,415 $20,070 $10,415
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,659 $8,523 $8,394
163,834
kWh
- $(-735.0)
04 2.4221: Install compressor air intakes in coolest locations $695 $300 $695
13,482
kWh
- -
05 2.2511: Insulate bare equipment $46 $50 - $46
-
MMBtu
-
TOTAL RECOMMENDED $20,579 $36,546 $21,268
211,900
kWh
$46
-
MMBtu
$(-735.0)
TOTAL IMPLEMENTED $10,415 $20,070 $10,415
-
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs