ITAC Assessment: ND0030
ITAC logo
ITAC Assessment: ND0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLATED & FINISHED METALS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,190 529,308
kWh
Natural Gas $44,232 12,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,391 - $1,391
16,999
kWh
-
02 2.3212: Optimize plant power factor $1,387 $1,966 $1,387
-
kWh
-
03 2.4133: Use most efficient type of electric motors $226 $2,240 $226
2,931
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $243 $628 $359
4,396
kWh
$(-116.0)
05 2.4221: Install compressor air intakes in coolest locations $882 $200 $882
10,844
kWh
-
TOTAL RECOMMENDED $4,129 $5,034 $4,245
35,170
kWh
$(-116.0)
TOTAL IMPLEMENTED $226 $2,240 $226
2,931
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs