ITAC Assessment: ND0027
ITAC logo
ITAC Assessment: ND0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLATED PLASTICS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 15,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,717 870,164
kWh
Natural Gas $77,072 30,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $18,705 $8,829 - $18,705
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $973 $160 - $973
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $383 $5,403 $383
6,741
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $460 $246
4,396
kWh
- $(-84.0)
05 2.4221: Install compressor air intakes in coolest locations $549 $300 $549
9,965
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $249 $450 $249
4,396
kWh
- -
TOTAL RECOMMENDED $21,021 $15,602 $1,427
25,498
kWh
$19,678
-
MMBtu
$(-84.0)
TOTAL IMPLEMENTED $383 $5,403 $383
6,741
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs