ITAC Assessment: ND0024
ITAC logo
ITAC Assessment: ND0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MEDICAL KITS
NAICS
n/a
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 332,221
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,846 3,029,015
kWh
Natural Gas $33,418 10,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $781 $4,640 $781
17,585
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $194 $3,060 $556
12,603
kWh
$(-362.0)
03 2.4221: Install compressor air intakes in coolest locations $117 $300 $117
2,638
kWh
-
04 2.3212: Optimize plant power factor $1,675 $1,400 $1,675
-
kWh
-
TOTAL RECOMMENDED $2,767 $9,400 $3,129
32,826
kWh
$(-362.0)
TOTAL IMPLEMENTED $2,650 $9,100 $3,012
30,188
kWh
$(-362.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs