ITAC Assessment: ND0023
ITAC logo
ITAC Assessment: ND0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product REFRACTORY BRICK
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 38,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,560 6,703,693
kWh
Natural Gas $702,842 264,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,750 $15,200 $2,750
41,618
kWh
- -
02 2.6218: Turn off equipment when not in use $12,216 $320 $12,216
179,074
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $15,791 $15,000 $15,791
231,536
kWh
- -
04 2.3212: Optimize plant power factor $8,052 $6,780 $8,052
-
kWh
- -
05 2.7261: Install timers and/or thermostats $2,729 $3,400 - $2,756
-
MMBtu
$(-27.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $296 $800 $418
6,155
kWh
- $(-122.0)
TOTAL RECOMMENDED $41,834 $41,500 $39,227
458,383
kWh
$2,756
-
MMBtu
$(-149.0)
TOTAL IMPLEMENTED $5,775 $19,400 $3,168
47,773
kWh
$2,756
-
MMBtu
$(-149.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs