ITAC Assessment: ND0022
ITAC logo
ITAC Assessment: ND0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ZN,PHOSPHATE ELECTROPLATING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,103 3,333,236
kWh
Natural Gas $149,472 111,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $15,304 $17,920 $15,304
189,039
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $11,245 $5,000 - $11,245
-
MMBtu
-
03 2.1213: Direct warmest air to combustion intake $645 $500 - $645
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,741 $749 $4,063
49,531
kWh
- $(-322.0)
05 2.4221: Install compressor air intakes in coolest locations $404 $400 $404
4,982
kWh
- -
06 2.7492: Use proper thickness of insulation on building envelope $565 $1,800 - $565
-
MMBtu
-
TOTAL RECOMMENDED $31,904 $26,369 $19,771
243,552
kWh
$12,455
-
MMBtu
$(-322.0)
TOTAL IMPLEMENTED $31,339 $24,569 $19,771
243,552
kWh
$11,890
-
MMBtu
$(-322.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs