ITAC Assessment: ND0018
ITAC logo
ITAC Assessment: ND0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LAWN TRACTORS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 16,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,897 4,538,980
kWh
Natural Gas $157,174 40,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $21,576 $62,547 - $21,576
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,520 - $8,262
171,454
kWh
- $(-2,742.0)
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,149 $400 - $3,149
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $1,895 - $1,895
39,273
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $149 $200 $149
3,224
kWh
- -
TOTAL RECOMMENDED $32,289 $63,147 $10,306
213,951
kWh
$24,725
-
MMBtu
$(-2,742.0)
TOTAL IMPLEMENTED - - - - -