ITAC Assessment: ND0015
ITAC logo
ITAC Assessment: ND0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area
n/a
Annual Production 66,000
thousand feet
Production Hrs. Annual 5,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,043 514,068
kWh
Natural Gas $7,707 1,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $1,838 $750 - $1,838
-
MMBtu
-
02 2.8121: Apply for tax-free status for energy purchases $1,700 $250 $1,700
-
kWh
- -
03 2.4133: Use most efficient type of electric motors $225 $453 $225
3,517
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $470 $200 $470
7,034
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11 - $58
879
kWh
- $(-47.0)
TOTAL RECOMMENDED $4,244 $1,653 $2,453
11,430
kWh
$1,838
-
MMBtu
$(-47.0)
TOTAL IMPLEMENTED $4,244 $1,653 $2,453
11,430
kWh
$1,838
-
MMBtu
$(-47.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs