ITAC Assessment: ND0009
ITAC logo
ITAC Assessment: ND0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product POLYVINYLCHLORIDES
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 92
Plant Area
n/a
Annual Production 5,500
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,852 1,988,863
kWh
Natural Gas $73,825 16,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4321: Upgrade obsolete equipment $943 $858 $943
16,999
kWh
-
02 2.3212: Optimize plant power factor $4,932 $2,835 $4,932
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $971 - $192
3,517
kWh
$779
04 2.7142: Utilize higher efficiency lamps and/or ballasts $420 - $630
11,430
kWh
$(-210.0)
05 2.4221: Install compressor air intakes in coolest locations $470 $200 $470
8,499
kWh
-
TOTAL RECOMMENDED $7,736 $3,893 $7,167
40,445
kWh
$569
TOTAL IMPLEMENTED $7,736 $3,893 $7,167
40,445
kWh
$569
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs