ITAC Assessment: AT0112
ITAC logo
ITAC Assessment: AT0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 2,600
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,351 1,658,851
kWh
Natural Gas $25,553 5,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2223: Enhance sensitivity of temperature control and cutoff $3,194 $2,000 - $3,194
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $572 - - $772
-
MMBtu
$(-200.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $492 $173 $492
9,379
kWh
- -
04 2.4133: Use most efficient type of electric motors $75 $154 $75
1,465
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $169 - $169
3,224
kWh
- -
06 2.4312: Improve lubrication practices $160 - $160
2,931
kWh
- -
TOTAL RECOMMENDED $4,662 $2,327 $896
16,999
kWh
$3,966
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $4,662 $2,327 $896
16,999
kWh
$3,966
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs