ITAC Assessment: ND0006
ITAC logo
ITAC Assessment: ND0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FORGED GEAR BLANKS
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,834 5,766,120
kWh
Natural Gas $50,175 12,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $49,967 $36,168 $49,967
-
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $17,647 $500 $17,647
361,372
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,076 $500 $2,076
42,497
kWh
-
04 2.4133: Use most efficient type of electric motors $788 $2,678 $788
19,343
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $481 - $626
12,896
kWh
$(-145.0)
TOTAL RECOMMENDED $70,959 $39,846 $71,104
436,108
kWh
$(-145.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs