ITAC Assessment: ND0002
ITAC logo
ITAC Assessment: ND0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PROCESSED RUBBER
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 27,500,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,630 4,121,923
kWh
Natural Gas $11,084 2,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $34,109 - $4,109
78,253
kWh
$30,000
02 2.4322: Use or replace with energy efficient substitutes $11,044 $2,898 $11,044
210,141
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $3,738 $6,000 $3,738
71,219
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $104 $70 $104
2,052
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,617 $397 $1,617
30,774
kWh
-
06 2.7122: Disconnect ballasts $65 $115 $65
1,172
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $6,111 $1,250
23,740
kWh
-
TOTAL RECOMMENDED $51,927 $15,591 $21,927
417,351
kWh
$30,000
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs