ITAC Assessment: UD0245
ITAC logo
ITAC Assessment: UD0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MIRRORS
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 7,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,529 1,303,048
kWh
Natural Gas $27,208 4,360
MMBtu
Fuel Oil #2 $23,019 6,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $5,160 $500 $5,160
60,082
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,498 $1,600 $3,739
40,445
kWh
$(-433.0)
-
MMBtu
$2,192
03 2.2122: Install / repair insulation on condensate lines $329 $425 - $329
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $3,625 $6,000 - $3,625
-
MMBtu
-
TOTAL RECOMMENDED $14,612 $8,525 $8,899
100,527
kWh
$3,521
-
MMBtu
$2,192
TOTAL IMPLEMENTED $10,987 $2,525 $8,899
100,527
kWh
$(-104.0)
-
MMBtu
$2,192
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs