ITAC Assessment: ND0001
ITAC logo
ITAC Assessment: ND0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DRIED PET FOODS
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 29,400
ton
Production Hrs. Annual 4,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,309 3,337,925
kWh
Natural Gas $103,070 38,196
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $17,472 $19,313 $17,472
-
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $840 $1,000 $840
18,464
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $107 $400 - $107
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $240 $200 - $240
-
MMBtu
05 2.4133: Use most efficient type of electric motors $527 $2,287 $527
11,723
kWh
-
06 2.7122: Disconnect ballasts $60 $200 $60
1,172
kWh
-
TOTAL RECOMMENDED $19,246 $23,400 $18,899
31,359
kWh
$347
-
MMBtu
TOTAL IMPLEMENTED $19,246 $23,400 $18,899
31,359
kWh
$347
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs