ITAC Assessment: NC0654
ITAC logo
ITAC Assessment: NC0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Pharmaceutical preparations
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 500,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,640,374 49,039,200
kWh
Electricity Demand $1,158,943 94,772
kW-mo/yr
Electricity Fees $(-26,119.0) -
Natural Gas $727,819 200,297
MMBtu
Waste Disposal Costs
Water Usage $100,000 10,000
Tgal
TOTAL YEARLY COSTS $4,601,017
RECOMMENDED SAVINGS* $1,453,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $1,381,024 $8,000,000 $1,924,640
36,800,000
kWh
$696,624
-
kW-mo/yr
$(-1,240,240.0)
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $15,030 $75,000 $11,245
215,000
kWh
$3,785
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $11,303 $20,000 $8,456
161,680
kWh
$2,847
-
kW-mo/yr
-
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,543 $6,700 - - $1,543
-
MMBtu
05 2.2437: Recover waste heat from equipment $44,735 $130,000 $16,684
319,000
kWh
$5,606
-
kW-mo/yr
$22,445
-
MMBtu
TOTAL RECOMMENDED $1,453,635 $8,231,700 $1,961,025
37,495,680
kWh
$708,862
-
kW-mo/yr
$(-1,216,252.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs