Assessment Year | 2021 |
---|---|
Principal Product | Pharmaceutical preparations |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
500,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,640,374 | 49,039,200 |
kWh
|
$0.054 | |
Electricity Demand | $1,158,943 | 94,772 |
kW-mo/yr
|
$12.23 | |
Electricity Fees | $(-26,119.0) | - |
|
- | |
Natural Gas | $727,819 | 200,297 |
MMBtu
|
$3.63 | |
Waste Disposal Costs | |||||
Water Usage | $100,000 | 10,000 |
Tgal
|
$10.00 | |
TOTAL YEARLY COSTS | $4,601,017 | ||||
RECOMMENDED SAVINGS* | $1,453,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $1,381,024 | $8,000,000 |
$1,924,640
36,800,000
kWh
|
$696,624
-
kW-mo/yr
|
$(-1,240,240.0)
-
MMBtu
|
|
02 | 2.4226: Use / purchase optimum sized compressor | $15,030 | $75,000 |
$11,245
215,000
kWh
|
$3,785
-
kW-mo/yr
|
- | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $11,303 | $20,000 |
$8,456
161,680
kWh
|
$2,847
-
kW-mo/yr
|
- | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $1,543 | $6,700 | - | - |
$1,543
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $44,735 | $130,000 |
$16,684
319,000
kWh
|
$5,606
-
kW-mo/yr
|
$22,445
-
MMBtu
|
|
TOTAL RECOMMENDED | $1,453,635 | $8,231,700 |
$1,961,025
37,495,680
kWh
|
$708,862
-
kW-mo/yr
|
$(-1,216,252.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs