Assessment Year | 2019 |
---|---|
Principal Product | Satellite dishes |
NAICS | 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
400,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $362,138 | 6,697,750 |
kWh
|
$0.054 |
Electricity Demand | $234,873 | 18,937 |
kW-mo/yr
|
$12.40 |
Natural Gas | $232,834 | 34,256 |
MMBtu
|
$6.80 |
TOTAL YEARLY COSTS | $829,845 | |||
RECOMMENDED SAVINGS* | $42,302 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,165 | $111,936 |
$14,681
271,870
kWh
|
$17,484
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $171 | $350 |
$171
3,174
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $255 | $660 |
$690
12,762
kWh
|
$225
-
kW-mo/yr
|
$(-480.0) | $(-180.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $131 | $300 |
$131
2,430
kWh
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $2,126 | $500 |
$1,012
18,708
kWh
|
$1,114
-
kW-mo/yr
|
- | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $2,730 | $10,000 |
$2,730
50,456
kWh
|
- | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $4,724 | $100 |
$4,724
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $42,302 | $123,846 |
$24,139
359,400
kWh
|
$18,823
-
kW-mo/yr
|
$(-480.0) | $(-180.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs