ITAC Assessment: NC0631
ITAC logo
ITAC Assessment: NC0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Satellite dishes
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 400,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,138 6,697,750
kWh
Electricity Demand $234,873 18,937
kW-mo/yr
Natural Gas $232,834 34,256
MMBtu
TOTAL YEARLY COSTS $829,845
RECOMMENDED SAVINGS* $42,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,165 $111,936 $14,681
271,870
kWh
$17,484
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $171 $350 $171
3,174
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $255 $660 $690
12,762
kWh
$225
-
kW-mo/yr
$(-480.0) $(-180.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $131 $300 $131
2,430
kWh
- - -
05 2.4226: Use / purchase optimum sized compressor $2,126 $500 $1,012
18,708
kWh
$1,114
-
kW-mo/yr
- -
06 2.7241: Install outside air damper / economizer on hvac unit $2,730 $10,000 $2,730
50,456
kWh
- - -
07 2.8114: Change rate schedules or other changes in utility service $4,724 $100 $4,724
-
kWh
- - -
TOTAL RECOMMENDED $42,302 $123,846 $24,139
359,400
kWh
$18,823
-
kW-mo/yr
$(-480.0) $(-180.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings