ITAC Assessment: NC0626
ITAC logo
ITAC Assessment: NC0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electric steering units
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 210
Plant Area 125,000
ft2
Annual Production 900,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,107 2,208,400
kWh
Electricity Demand $61,831 4,280
kW-mo/yr
Natural Gas $12,554 1,679
MMBtu
TOTAL YEARLY COSTS $181,492
RECOMMENDED SAVINGS* $21,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,564 $40,273 $6,855
141,341
kWh
$4,709
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $532 $871 $532
10,976
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $240 $45 $150
3,096
kWh
$90
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,034 $135 $1,523
31,392
kWh
$646
-
kW-mo/yr
- $(-90.0) $(-45.0)
05 2.2437: Recover waste heat from equipment $2,962 $4,000 - - $2,962
-
MMBtu
- -
06 2.4226: Use / purchase optimum sized compressor $2,170 $9,000 $2,170
44,760
kWh
- - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,977 $200 - $1,977
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $21,479 $54,524 $11,230
231,565
kWh
$7,422
-
kW-mo/yr
$2,962
-
MMBtu
$(-90.0) $(-45.0)
TOTAL IMPLEMENTED $15,575 $40,608 $8,378
172,733
kWh
$7,332
-
kW-mo/yr
- $(-90.0) $(-45.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs