Assessment Year | 2019 |
---|---|
Principal Product | Electric steering units |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 210 |
Plant Area |
125,000
ft2
|
Annual Production | 900,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,107 | 2,208,400 |
kWh
|
$0.048 |
Electricity Demand | $61,831 | 4,280 |
kW-mo/yr
|
$14.45 |
Natural Gas | $12,554 | 1,679 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | $181,492 | |||
RECOMMENDED SAVINGS* | $21,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,575 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,564 | $40,273 |
$6,855
141,341
kWh
|
$4,709
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $532 | $871 |
$532
10,976
kWh
|
- | - | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $240 | $45 |
$150
3,096
kWh
|
$90
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,034 | $135 |
$1,523
31,392
kWh
|
$646
-
kW-mo/yr
|
- | $(-90.0) | $(-45.0) | |
05 | 2.2437: Recover waste heat from equipment | $2,962 | $4,000 | - | - |
$2,962
-
MMBtu
|
- | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $2,170 | $9,000 |
$2,170
44,760
kWh
|
- | - | - | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,977 | $200 | - |
$1,977
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $21,479 | $54,524 |
$11,230
231,565
kWh
|
$7,422
-
kW-mo/yr
|
$2,962
-
MMBtu
|
$(-90.0) | $(-45.0) | ||
TOTAL IMPLEMENTED | $15,575 | $40,608 |
$8,378
172,733
kWh
|
$7,332
-
kW-mo/yr
|
- | $(-90.0) | $(-45.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs